Initial Design Planning and Component Selection

SU

Sarsılmaz UAV Team

1 min read

What did we do in January?

In January 2024, we took the first concrete steps in our UAV development process. This month marked a crucial milestone as we focused on shaping our vehicle's general design concept and finalizing key technical decisions.

Ekran_Resmi_2025-05-02_13.12.42.png

Throughout January, our team held regular meetings with intensive brainstorming sessions. We thoroughly analyzed the competition's mission requirements and performance expectations, aiming to design a structure that would achieve an optimal balance between flight endurance and maneuverability.

PHOTO-2025-05-02-13-01-16.jpg

We made critical design decisions about the vehicle's structure, and propulsion layout. After comparing several configurations, we chose an approach focused on creating a lightweight, durable, and mission-capable platform with enhanced

We also began preparing a procurement list for materials and components needed in upcoming prototype tests. This list serves as a crucial step in streamlining the manufacturing process and ensuring timely test scheduling.

92aeda9a-5af7-4b9b-83cc-7d16519876f5.png

January proved highly productive as we established the project's technical and strategic foundation. This phase was characterized by strong team coordination and the successful translation of ideas into concrete plans. Our progress during this period has paved the way for more structured and efficient testing and manufacturing in the coming months.